Processes

Build kits

How build kits are reshaped as AGI capability advances.

ProcessesBuild kits
Build kits — illustrated

The bottom line

Only about 15% of Build kits is information work today — the rest is physical, and moves slowly. The exposure is concentrated in the back office: the books, the paperwork, the scheduling, the marketing.

Why: With no seeded child occupations, the scalar is derived directly from the process name 'Build kits' and its aerospace and shipbuilding industry context. Building kits for manufacturing assembly is an inherently hands-on material handling task; while AI can orchestrate inventory logic and pick lists, the value-producing work requires physical sorting and staging, placing this firmly in the physical band.

grounded in the economy graph · digital scalar 0.15 · physical

Business-as-Code

Read as an executable program — the work decomposed into Code, Generative, Agentic, and Human.

Build kits sits inside a larger value-flow — 1 parent structure it composes into. The hierarchy is grounding, not the story: it tells you which aggregate exposure Build kits inherits.

Where Build kits sits

Related articles

No articles yet for this entity.

Recent capability events

No capability events for this entity yet.

How the work flows

Trigger: A production schedule releases a material picking list or work order requiring a specific assembly kit.

  1. Receive the kitting request and pick list
  2. Locate and retrieve required individual components from inventory
  3. Verify component part numbers, quantities, and traceability records
  4. Group and package components into designated kit containers or carts
  5. Deliver the completed kit to the specified production staging area

Outcome: A fully assembled and verified kit of parts is delivered to the designated assembly workstation.

Measured by

Kitting Accuracy RateKitting Cycle TimeOn-Time Kit DeliveryParts Shortage Rate