Processes

Manage public right of the way

How manage public right of the way are reshaped as AGI capability advances.

ProcessesManage public right of the way
Manage public right of the way — illustrated

The bottom line

About 50% of the work in Manage public right of the way is information-shaped and increasingly AI-deliverable, with the rest a hybrid of judgment and hands-on work. The automation frontier runs straight through the middle of this role.

Why: Because no child occupations are seeded for this composite, the scalar is derived entirely from the process name 'Manage public right of the way' and its 'Executive and General Government Support' industry lens. Managing physical civic assets involves a relatively even blend of digital knowledge work (permitting, GIS mapping, legal oversight) and physical coordination (site inspections, orchestrating utility or road work), placing it at the center of the hybrid band.

grounded in the economy graph · digital scalar 0.50 · hybrid

Business-as-Code

Read as an executable program — the work decomposed into Code, Generative, Agentic, and Human.

Manage public right of the way sits inside a larger value-flow — 1 parent structure it composes into. The hierarchy is grounding, not the story: it tells you which aggregate exposure Manage public right of the way inherits.

Where Manage public right of the way sits

Related articles

No articles yet for this entity.

Recent capability events

No capability events for this entity yet.

How the work flows

Trigger: A contractor, utility company, or citizen submits an application to perform work, host an event, or obstruct a public street, sidewalk, or easement.

  1. Receive right-of-way permit applications and traffic control plans
  2. Review applications for safety, zoning, and engineering compliance
  3. Assess and collect right-of-way usage fees
  4. Issue permits and coordinate schedules to minimize public disruption
  5. Conduct field inspections of active work zones
  6. Verify site restoration and close out the permit

Outcome: The public right-of-way is safely utilized, appropriately restored post-activity, and returned to full public use with minimal disruption.

Measured by

Permit Processing Cycle TimeInspection Pass RateRight-Of-Way Fee RevenueTraffic Disruption Duration