How obtain resources are reshaped as AGI capability advances.

Only about 25% of Obtain resources is information work today — the rest is physical, and moves slowly. The exposure is concentrated in the back office: the books, the paperwork, the scheduling, the marketing.
Why: With no child occupations seeded, the scalar relies entirely on the APQC lens and process description. The top-level category 'Design and construct productive assets' carries a strong physical prior (around 0.20). The specific process of gathering construction resources and verifying training represents the on-site orchestration, procurement, and dispatch layer of physical work, keeping it firmly in the physical band.
grounded in the economy graph · digital scalar 0.25 · physical
No articles yet for this entity.
No capability events for this entity yet.
Trigger: A project plan or construction phase initiates the requirement for specific labor, materials, and equipment.
Outcome: All necessary personnel, equipment, and materials are secured, verified for proper training, and ready for deployment to the worksite.